Search by date

Search Results

2788 results for "building bama"

The front exterior of the Student Health Center before renovations start

Building Bama: Student Health Center Addition

A new addition to the Student Health Center will increase clinical services provided to students and boost research through a new MRI suite.

The Tuska statue being placed on its pedestal outside Bryant-Denny Stadium

Building Bama: Tuska Plaza

A new greeter to the UA campus recently moved from across town to his new home in front of Bryant-Denny Stadium along University Boulevard.

The front entrance of the Math and Science Education Building

Building Bama: Math and Science Education Building

A complete interior renovation and exterior improvements majorly upgraded this campus facility.

A rendering of the Second Avenue Overpass

Building Bama: 2nd Avenue Overpass

The new campus corridor will soon alleviate the headache of waiting on a train to pass along the south edge of campus.

Building Bama: Where Will the Water Go?

Building Bama: Where Will the Water Go?

To allow water to properly drain and prevent future flooding, a stormwater basin is currently being constructed below the Tutwiler Triangle Lot at the corner of Bryant Drive and 10th Avenue.

Building Bama: Can You Hear Me Now?

Building Bama: Can You Hear Me Now?

With the ever-increasing demand for mobile data, wireless carriers are installing “small cells” around campus to deliver the coverage, capacity and network reliability to users where they need it most. 

Building Bama: Crimson Energy Connection

Building Bama: Crimson Energy Connection

UA’s department of energy management recently rolled out the Crimson Energy Connection to allow students, faculty and staff to monitor energy consumption in buildings and residence halls.

Building Bama: Where’s Waldo at UA?

Building Bama: Where’s Waldo at UA?

Take a look at the latest locations of several key groups at the Capstone so you can avoid an unwanted game of hide-and-seek.

Building Bama: The Beat Goes On

Building Bama: The Beat Goes On

While several major projects wrapped up ahead of the start of the 2019-20 academic year, UA’s department of construction administration will continue to work throughout the year on other projects around campus.